Post Update – Plane’s Anatomy, AT-402 Episode

Everything by me, as usual

Just wanted to add a small update to my previous AT-402 anatomy post. Driving to the field today, I came across 9A-DKJ being packed into a freight container for a trip to somewhere. Not waisting the opportunity, I snapped a quick photo…

How to pack an airplane... as noted before, the engines and prop had already been removed for overhaul, so all that was left was to take down the wings and landing gear (which are to the left outside the photo)
How to pack an airplane... as noted before, the engines and prop had already been removed for overhaul, so all that was left was to take down the wings and landing gear (which are to the left outside the photo)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s